Abstract:The preparation of spare full ladles at some steel works was analyzed for five reasons and the formula calculating the time of every procedure without spare full ladles are proposed.Six measures which could decrease the number of spare full ladles before start of casting are put forward. Finally, the formulas of rational number of spare full ladles and maximal heat number of sequential casting are given.
王锋;田乃媛;贺东风;徐安军. 连铸机开浇前备包现象的讨论[J]. 钢铁, 2008, 43(3): 41-0.
WANG Feng;TIAN Naiyuan;HE Dongfeng;XU Anjun. Discussion on Full Ladle Preparation for Sequential Casting. Iron and Steel, 2008, 43(3): 41-0.