TISCO 4350m3 blast furnace |
[中]唐顺兵 [英]TANG Shun-Bing |
|
|
|
Abstract Abstract Since December 2008, TISCO 4350 m3 blast furnace availability ratio is 2.40 t/(m3.d)for continuous and hearth sectional area capacity factor is over 66.0 t/(m2.d)by intensifying crude fuel handling and cast house working as well as high oxygen enrichment high coal injection operation which can realize a reasonable gas current distribution.
|
Received: 30 December 2009
|
|
|
|
[1] |
XIANG Zhong-yong,JIANG Xi,. Analysis of production indexes of large BF by new evaluation method for production efficiency[J]. Iron and Steel, 2018, 53(8): 38-43. |
[2] |
LEI Ming,ZHANG Ming-xing,DU Ping,QIU Hui. Analysis of reasonable pulverized coal rate of Shasteel 5 800 m3 blast furnace[J]. Iron and Steel, 2015, 50(5): 26-29. |
[3] |
XIE Hong-en,FU Wei-guo,RAO Jia-ting,WEN Yong-cai. Evaluation Strategy of Intensifying Degree of Blast Furnace[J]. Iron and Steel, 2013, 48(5): 17-20. |
[4] |
XIANG Zhong-yong,WANG Xiao-liu,YIN Han. More Discussion on Evaluation Method for Productive Efficiency of Ironmaking Blast Furnace[J]. Iron and Steel, 2013, 48(3): 86-90. |
[5] |
HUANG Zhu-cheng,YI Ling-yun,HU Bing,JIANG Tao. Experimental Investigation on Sintering With High Ratio of Limonite[J]. Iron and Steel, 2012, 47(5): 9-13. |
[6] |
OUYANG Biao,XIANG Zhong-yong. A Novel Method for Calculation of Blast Furnace Blower Capacity Based on Its Maximal Bosh Gas Volume[J]. Iron and Steel, 2012, 47(4): 19-22. |
|
|
|
|