Revamping of Wall Coherent Jet Oxygen Lance and Optimization of Process on 100 t EAF at Angang |
JI Jianying1,WANG Bingmin1,ZHU Rong2 |
1. No.1 Steelmaking, Anyang Iron and Steel Group Co., Ltd., Anyang 455004, Henan, China; 2. University of Science and Technology Beijing, Beijing 100083, China |
|
|
Abstract The wall coherent jet oxygen lance on 100 t EAF at Anyang was upgraded.But afterwards the hot metal charging was longer, accident was occurred frequently, consumption was high, thus the process was optimized for hot metal charging system, lance positioning, production schedule, scrap structure, power input,oxygen blowing,slag forming and carbon injection.The satisfactory results were obtained.
|
Received: 01 January 1900
|
|
|
|
[1] |
LIU Peng, SUI Ya-fei, XU Gang-jun, ZHOU Jun-jun, ZENG Quan-wen. Inclusion generation and control of low carbon steel[J]. Iron and Steel, 2020, 55(2): 67-74. |
[2] |
ZHU Rong,WU Xuetao,WEI Guangsheng,TIAN Bohan. Development of green and intelligent technologies in electric #br#
arc furnace steelmaking processes[J]. Iron and Steel, 2019, 54(8): 9-20. |
[3] |
LIU Peng,SUI Yafei,XU Gangjun,DENG Zhixun. Control of nitrogen in steel under low hot metal ratio[J]. Iron and Steel, 2019, 54(6): 121-126. |
[4] |
Lü Ming1,LI Hang1,YANG Lingzhi2,LI Xiaoming1, XING Xiangdong1,YANG Zeshi2. Effect of bottom blowing flow rate near EBT area on EAF steelmaking[J]. Iron and Steel, 2019, 54(10): 38-44. |
[5] |
WANG Peng,WU Wei,MENG Hua-dong,YIN Chuan-lei ,LI Xiang-chen. Process optimization for improving hit rate of BOF end-point temperature in Huaigang Works[J]. Iron and Steel, 2018, 53(3): 96-103. |
[6] |
WANG Ming-hui,LEI Na,ZHAO Nai-sheng. Application of macro examination on quality control of casting slab[J]. , 2018, 36(2): 22-24. |
|
|
|
|