|
|
Discussion on Extending Continuous Running Time of the CDQ Device |
DUAN Su-lan1,LI Chun-yan2,XU Qin1 |
1. Baotou Steel and Iron Vocational Technical College, Baotou 014010, Nei Mongol, China 2. The Coking Plant of Inner Mongolia Baotou Steel Union Co., Ltd., Baotou 014010, Nei Mongol, China |
|
|
Abstract The acting factors of continuous running time were analyzed in Baotou Steel and Iron Group Co., Ltd.The subjective factors of CDQ equipment service life and objective factors were discussed.Through using new materials,modification and process optimization measures for key equipment, the CDQ equipment maintenance period is up to 1.5 years.The valuable experiences in management and operation were provided for the production, safe and smooth operation in the future.
|
Received: 02 July 2013
Published: 20 February 2014
|
|
|
|
[1] |
潘立慧、魏松波.干熄焦技术[M].冶金工业出版社,2005.
|
[1] |
潘立慧、魏松波.干熄焦技术[M].冶金工业出版社,2005.
|
[1] |
CHEN Shixuan,DU Meifang,ZHAO Mengran,GUO Xinwei,YU Juan. Efficiency analysis of CDQ waste heat recovery #br# and conversion system[J]. Iron and Steel, 2019, 54(6): 114-120. |
[2] |
XUE Li-min,,FAN Zheng-yun,,,ZHU Chang-jun,PENG Jun-shan, DONG Feng-jie,GUO Hai-tao. Stress on internal wall of annular air duct of 260 t/h large coke dry quenching[J]. Iron and Steel, 2019, 54(1): 96-99. |
[3] |
JIANG Xi,,BAI Xing-quan,ZHOU Dong-dong. Injection of coke dry quenching dust in blast furnace[J]. Iron and Steel, 2017, 52(11): 64-68. |
[4] |
FENG Jun-sheng, DONG Hui, WANG Ai-hua, ZHANG Qi, CAI Jiu-ju. Recovery system and key issues of vertical tank for recovering sinter waste heat[J]. Chinese Journal of Iron and Steel, 2015, 27(6): 7-11. |
[5] |
ZHANG Xin-xin1,ZHANG An-qiang1,FENG Yan-hui1,LIU Jian1,ZHANG Chang-qing2,YU Zhen-dong2. Energy Consumption Analysis and Technologies of Waste Heat Utilization for Coke Oven[J]. Iron and Steel, 2012, 47(8): 1-4. |
[6] |
YAN Dingliu;GUO Peimin;QI Yuanhong. Analysis of Dry Granulation Route of Blast Furnace Slag[J]. Chinese Journal of Iron and Steel, 2008, 20(6): 11-0. |
|
|
|
|