Model construction and control method for power generation system of parallel sintering waste heat boiler |
HU Chang-qing,YAN Long-ge,ZHAO Kai |
(College of Metallurgy and Energy,North China University of Science and Technology, Tangshan 063009, Hebei,China) |
|
|
Abstract Focusing on the issues of poor operation stability and higher outage rate for sintering waste heat power generation system,a mathematical model of multi waste heat boilers paralleling operation power system was constructed based on the theory of probability. The influence of the working status of waste heat boilers on the operation stability of the waste heat power generation system was analyzed. The operation program of waste heat boiler and system steady running,and regulation strategy of steam were put forward. Adopted the in situ steam flow data,the results showed that the operation stability of power generation system would be improved through parallel operation of multiple waste heat boilers. For the sintering waste heat power generation system of four sets of waste heat boilers in parallel shared a generator,the system stable operation probability would exceed 0.98 if three or more waste heat boilers were in normal work. When the system steam was insufficient,the stable operation probability of power generation system could reach above 0.96 through the import of steam from steam network.
|
Received: 05 August 2016
Published: 10 March 2017
|
|
|
|
[1] |
蔡九菊,王建军,陈春霞,等. 钢铁企业余热资源的回收与利用[J]. 钢铁,2007,42(6):1-7.
|
[1] |
蔡九菊,王建军,陈春霞,等. 钢铁企业余热资源的回收与利用[J]. 钢铁,2007,42(6):1-7.
|
[2] |
陈瑾瑜,马忠民. 我国烧结余热发电现状及发展建议[J]. 冶金动力,2015,(3):67-70.
|
[2] |
陈瑾瑜,马忠民. 我国烧结余热发电现状及发展建议[J]. 冶金动力,2015,(3):67-70.
|
[3] |
胡长庆,师学峰,张玉柱,等. 烧结余热回收发电关键技术[J]. 钢铁,2011,46(1):86-91.
|
[3] |
胡长庆,师学峰,张玉柱,等. 烧结余热回收发电关键技术[J]. 钢铁,2011,46(1):86-91.
|
[4] |
王兆鹏,胡晓民. 烧结余热回收发电现状及发展趋势[J]. 烧结球团,2008,33(1):31-34.
|
[4] |
王兆鹏,胡晓民. 烧结余热回收发电现状及发展趋势[J]. 烧结球团,2008,33(1):31-34.
|
[5] |
A.C.Caputo, P.M.Pelagagge. Heat recovery from moving cooling beds: transient modeling by dynamic simulation[J]. Applied Thermal Engineering,2000,20(1):49-67.
|
[5] |
A.C.Caputo, P.M.Pelagagge. Heat recovery from moving cooling beds: transient modeling by dynamic simulation[J]. Applied Thermal Engineering,2000,20(1):49-67.
|
[6] |
A.C.Caputo, P.M.Pelagagge. Fuzzy control of heat recovery systems from solid bed cooling[J]. Applied Thermal Engineering,1999,19(1):21-35.
|
[6] |
A.C.Caputo, P.M.Pelagagge. Fuzzy control of heat recovery systems from solid bed cooling[J]. Applied Thermal Engineering,1999,19(1):21-35.
|
[7] |
隋元春,姚源,魏孟军,等. 加热炉烟气蒸汽余热回收发电系统及发电方法:中国,201310245258.3[P]. 2013.09.1.
|
[7] |
隋元春,姚源,魏孟军,等. 加热炉烟气蒸汽余热回收发电系统及发电方法:中国,201310245258.3[P]. 2013.09.1.
|
[1] |
HE An-rui, SONG Yong, SUN Wen-quan, LIN Feng-qin, ZHANG Nan-feng, LI Jian-hua. Tunnel Furnace Optimization Control of Thin Slab Continuous Casting and Continuous Rolling[J]. Chinese Journal of Iron and Steel, 2014, 1(6): 1-6. |
[2] |
ZHANG Hua,CHEN Feng-yin,WANG Yan-hong. End Point Optimized Control for BOF Steel-Making Process Based on the Characteristic of Subsidiary Material′s Movement[J]. Chinese Journal of Iron and Steel, 2013, 25(1): 5-8. |
[3] |
NIU Jue;WEN Zhi;WANG Junsheng;LU Yuezhang;ZHAO Quanqing. Computer Control System for Optimizing Heating of Large Continuous RollerHearth Heat Treatment Furnace[J]. Iron and Steel, 2007, 42(2): 72-0. |
[4] |
ZHANG Fubo;WANG Guodong;ZHANG Dianhua;LIU Xianghua. Preparatory Study on Optimal Control of ElectroHydraulic Fatigue Testing Machine[J]. Chinese Journal of Iron and Steel, 2007, 19(1): 57-0. |
[5] |
LIU Xianghua;WANG Guodong;DU Linxiu;LIU Zhenyu. Flexible Steels and Flexible Rolling Technology[J]. Iron and Steel, 2006, 41(11): 32-0. |
|
|
|
|