钢铁
 
             Home | About Journal | Editorial Board | Instruction for Authors | Subscriptions | Advertisement | Contacts Us | Chinese
Iron and Steel  2018, Vol. 53 Issue (3): 96-103    DOI: 10.13228/j.boyuan.issn0449-749x.20170389
Current Issue| Next Issue| Archive| Adv Search |
Process optimization for improving hit rate of BOF end-point temperature in Huaigang Works
WANG Peng1,WU Wei1,MENG Hua-dong1,YIN Chuan-lei2 ,LI Xiang-chen1
(1. Metallurgical Technology Research Department, Central Iron and Steel Research Institute, Beijing 100081, China
2. Huaigang Special Steel Co., Ltd., Huai’an 223002, Jiangsu, China)

Copyright © IRON AND STEEL 
Supported by: Beijing Magtech