Stress on internal wall of annular air duct of 260 t/h large coke dry quenching |
XUE Li-min1,2,FAN Zheng-yun1,2,3,ZHU Chang-jun3,PENG Jun-shan3, DONG Feng-jie3,GUO Hai-tao3 |
(1. Beijing Key Laboratory of Green Recyclable Process for Iron and Steel Production Technology, Beijing 100043,China
2. Department of Iron and Steel, Research Institute of Technology of Shougang Group Co., Ltd., Beijing 100043, China
3. Department of Production and Technology, Xishan Coking Company of Shougang Jingtang,Tangshan 063200, Hebei, China) |
|
|
Abstract In order to get the method to inhibit the destruction of inwall,the effects of temperature field,amount of coke and the triangle wall on the deformation of internal wall of annular air duct were studied by the coupled method of thermal stress and structural stress in 260 t/h large CDQ. It was found that due to the effect of the temperature field,the deformation of the internal wall increased more remarkably than that in the cold condition. It is indicated that the thermal stress is major factor on the internal wall deformation. Under the cold or hot conditions,the deformation of the internal wall of the annular air duct will be enlarged with the increase in the quantity of coke in CDQ. The triangular wall can inhibit the deformation of the internal wall obviously. When the temperature field is applied,the deformation of the internal wall was alleviated when the quantity of coke reaches 4 meters more or less. The most reasonable height of the triangular stand wall is 1.0 meters.
|
Received: 19 June 2018
Published: 22 February 2019
|
|
|
|
|
[1] |
王希波,蔡国庆,秦建涛,等.干熄炉倾斜烟道和环形风道用耐火材料的选择及其损毁原因[J].耐火材料, 2014, 48(2):135-138
|
[1] |
王希波,蔡国庆,秦建涛,等.干熄炉倾斜烟道和环形风道用耐火材料的选择及其损毁原因[J].耐火材料, 2014, 48(2):135-138
|
[2] |
冯文斌.干熄炉内筒倒塌原因分析及改进措施[J].工业炉, 2014, 36(2):69-71
|
[2] |
冯文斌.干熄炉内筒倒塌原因分析及改进措施[J].工业炉, 2014, 36(2):69-71
|
[3] |
徐国涛,吕永劲,盛军波,等.大型干熄焦炉环形风道破损原因分析及热态模拟研究[J].耐火材料, 2015, 49(3):204-207
|
[3] |
徐国涛,吕永劲,盛军波,等.大型干熄焦炉环形风道破损原因分析及热态模拟研究[J].耐火材料, 2015, 49(3):204-207
|
[4] |
郭飞,于进江.干熄焦环形风道损坏原因分析与技术改造[J].燃料与化工, 2017, 48(5):32-34
|
[4] |
郭飞,于进江.干熄焦环形风道损坏原因分析与技术改造[J].燃料与化工, 2017, 48(5):32-34
|
[5] |
赵景,廖在明.干熄炉环形风道结构改造与探索[J].燃料与化工, 2014, 45(2):28-30
|
[5] |
赵景,廖在明.干熄炉环形风道结构改造与探索[J].燃料与化工, 2014, 45(2):28-30
|
[6] |
汪洁,钱江.干熄焦装置环形风道区结构改进探讨[C]., , :99-103
|
[6] |
汪洁,钱江.干熄焦装置环形风道区结构改进探讨[C]., , :99-103
|
[7] |
杨梦,张美杰,邵志君,朱应军,顾华志.干熄焦炉环形风道内墙损毁的应力分析与修复[J].煤炭转化, 2017, 40(5):50-55
|
[7] |
杨梦,张美杰,邵志君,朱应军,顾华志.干熄焦炉环形风道内墙损毁的应力分析与修复[J].煤炭转化, 2017, 40(5):50-55
|
[8] |
杨林,胡林,张兴刚.二维晶格颗粒堆积中侧壁的压力分布与转向系数[J].物理学报, 2015, 63(13):212-218
|
[8] |
杨林,胡林,张兴刚.二维晶格颗粒堆积中侧壁的压力分布与转向系数[J].物理学报, 2015, 63(13):212-218
|
[9] |
王振峰,颜培刚,唐洪飞,等.高压气冷涡轮内冷通道换热系数准则式的研究[J].工程热物理学报, 2010, 31(2):247-250
|
[9] |
王振峰,颜培刚,唐洪飞,等.高压气冷涡轮内冷通道换热系数准则式的研究[J].工程热物理学报, 2010, 31(2):247-250
|
[1] |
SUN Jian-liang, LI Shuo, JIAO Yun-jing, SUN Meng-qian, ZHANG Xin-you. Large cylinder induction heating process technology based on Curie point effect[J]. Iron and Steel, 2019, 54(5): 78-85. |
[2] |
CHEN Wei,,YU Xing-wang,,WANG Jia-qi,,WANG Bao-xiang,,CHEN Ying,,MA Jin-hong,. Initiation locations of longitudinal surface cracks on beam blank in mold of continuous casting[J]. Iron and Steel, 2017, 52(3): 36-41. |
[3] |
MA Yu- xi,DUAN Xiao- lin,LIU Jing,GUO Bin,TAO Jun- hui,DU Ming. Cause of cracking of 800MPa grade Ti- added high strength steel cast slab[J]. Chinese Journal of Iron and Steel, 2016, 28(2): 51-56. |
[4] |
PAN Li- ping,HE Zhu,LI Bao- kuan. Numerical simulation on the heat deformation and thermal stress of twin roll casting[J]. Chinese Journal of Iron and Steel, 2016, 28(1): 25-31. |
[5] |
ZHAO Shu-mao,HU Xiao-bing,MEI Guo-hui. Thermal stress analysis of continuous liquid steel temperature sensor[J]. Chinese Journal of Iron and Steel, 2015, 40(4): 40-47. |
[6] |
JIAO Ke-xin, , ZHANG Jian-liang, , ZUO Hai-bin, , SHEN Meng ,TIE Jin-yan , LI Feng-guang,. Thermal Trial Analysis on Unsteady Heat Transfer for Blast Furnace Cooling Stave[J]. Iron and Steel, 2014, 49(12): 13-17. |
|
|
|
|