|
|
Preparation and production process optimization of carbon-bearing pellets for rotary bottom furnace |
YANG Tao1,2, LEI Jie1, REN Xiao-jian3, WAN Qi-lin3, ZHOU Rong-bao3, LONG Hong-ming1,2 |
1. School of Metallurgical Engineering, Anhui University of Technology, Ma’anshan 243032, Anhui, China; 2. Anhui Province Key Laboratory of Metallurgy Engineering and Resources Recycling, Anhui University of Technology, Ma’anshan 243002, Anhui, China; 3. Resource Utilization Research Office, Jiangsu Yonggang Group Co., Ltd., Zhangjiagang 215628, Jiangsu, China |
|
|
Abstract The rotary hearth furnace direct reduction is recognized as a typical process for the treatment of iron- and zinc-containing dust sludge,due to the full utilization of iron,carbon and zinc. The metallized pellets produced by the rotary hearth furnace are available for iron and steel production and high value added resources such as zinc oxide powder are recovered. The preparation process parameters and reduction roasting system of carbon-bearing pellets were analyzed and optimized based on the actual production conditions,contributing to the promotion and improvement of the process of treating iron-bearing dust sludge in the rotary hearth furnace. The effects of pelletizing process parameters such as moisture,roll speed and pressure on the sphericity and strength of carbon-bearing pellets were revealed. The optimal results were derived at 14% mix balling moisture,6.0 r/min roller speed and 2.5×104 N/cm roller pressure. The effects of roasting temperature,roasting time and placement on the strength properties,metallization rate and dezincification rate of metallized pellets were investigated. Raising the roasting temperature and prolonging the roasting time appropriately resulted in an increase of metallic iron crystallization and a decrease of porosity. In addition,the metallic iron phase,faujasite and slag linkage were enhanced,leading to an improvement in the strength of the metallized pellets. The roasting temperature significantly affected the pellet microstructure and compressive strength. The optimal roasting temperature was 1 275 ℃ and roasting time was 25 min. The effect of placement on the properties of metallized pellets such as average compressive strength,metallization rate and dezincification rate was slight. However,the three-layer placement caused an increased difference in properties among the pellets compared to the two-layer placement.
|
Received: 13 October 2022
|
|
|
|
[1] 王静松,李岩,冯怀萱,等. 钢铁产业集聚区难处理尘泥处理与全量资源化利用进展[J]. 工程科学学报,2021,43(12):1737.(WANG Jing-song,LI Yan,FENG Huai-xuan,et al. Progress in treating difficult-to-handle dust and sludge and full-scale resource utilization in an iron and steel industry cluster[J]. Chinese Journal of Engineering,2021,43(12):1737.) [2] 尚海霞,李海铭,魏汝飞,等. 钢铁尘泥的利用技术现状及展望[J]. 钢铁,2019,54(3):9.(SHANG Hai-xia,LI Hai-ming,WEI Ru-fei,et al. Present situation and prospect of iron and steel dust and sludge utilization technology[J]. Iron and Steel,2019,54(3):9.) [3] 金永龙,刘思远,秦国旗,等. 典型的处置钢铁企业含锌固废工艺的能效分析[J]. 冶金能源,2022,41(3):18.(JIN Yong-long,LIU Si-yuan,QIN Guo-qi,et al. Energy efficiency analysis of typical technologies for disposal ferrous solid waste combined with Zn in steel plants[J]. Energy for Metallurgical Industry,2022,41(3):18.) [4] 佟帅,李晨晓,王书桓,等. 钢渣处理工艺及综合利用分析[J]. 冶金能源,2020,39(6):3.(TONG Shuai,LI Chen-xiao,WANG Shu-huan,et al. Steel slag treatment process and comprehensive utilization analysis[J]. Energy for Metallurgical Industry,2020,39(6):3.) [5] 刘自民,饶磊,桂满城,等. 马钢含铁尘泥综合利用研究与实践[J]. 中国冶金,2018,28(9):71.(LIU Zi-min,RAO Lei,GUI Man-cheng,et al. Research and practice of comprehensive utilization of Fe-containing dust in Masteel[J]. China Metallurgy,2018,28(9):71.) [6] LI Xiang,TANG Ping,JIANG Jing,et al. Control of zinc-containing dust agglomerates in basic oxygen furnace flue gas cleaning system[J]. ISIJ International,2021,61(3):763. [7] 吴胜利,张风杰,张建良,等. 钢厂含锌粉尘基本物性及其成球性能研究[J]. 环境工程,2015,33(7):90.(WU Sheng-li,ZHANG Feng-jie,ZHANG Jian-liang,et al. Basic characteristics and balling performance of zinc-bearing dust in steel plant[J]. Environmental Engineering,2015,33(7):90.) [8] 毛瑞,张建良,刘征建,等. 钢铁流程含铁尘泥特性及其资源化[J]. 中南大学学报(自然科学版),2015,46(3):774.(MAO Rui,ZHANG Jian-liang,LIU Zheng-jian,et al. Characteristic and resource utilization technique of dust and sludge containing iron from steel production process[J]. Journal of Central South University(Natural Science),2015,46(3):774.) [9] 巨建涛,党要均. 钢铁厂含锌粉尘处理工艺的现状及发展[J]. 材料导报,2014,28(9):109.(JU Jian-tao,DANG Yao-jun. Present state and development of zinc-bearing dust treatment process in iron and steel plants[J]. Materials Reports,2014,28(9):109.) [10] 田玮,彭犇,王晟,等. 含锌电炉粉尘处理技术的研究进展[J]. 环境工程,2019,37(2):144.(TIAN Wei,PENG Ben,WANG Sheng,et al. Research progress of treatment technologies for zn-containing electric arc furnaces dust[J]. Environmental Engineering,2019,37(2):144.) [11] QIAN Li-xin,YANG Tao,LONG Hong-ming,et al. Recycling of waste V2O5-WO3/TiO2 catalysts in the iron ore sintering process via a preballing approach[J]. ACS Sustainable Chemistry and Engineering,2021,9(48):16373. [12] 杨涛,刘爽,钱立新,等. 废塑料在钢铁生产流程中资源化利用研究进展[J]. 钢铁研究学报,2022,4(10):1047.(YANG Tao,LIU Shuang,QIAN Li-xin,et al. Recycling waste plastics in iron and steel production process: A review[J].Journal of Iron and Steel Research,2022,4(10):1047.) [13] PEI Yuan-dong,WU Sheng-li,CHEN Shao-guo,et al. Sintering of solid waste generated in iron and steel manufacturing process in Shougang Jingtang[J]. Journal of Iron and Steel Research International,2017,24(7):697. [14] 魏恒,范越文,胡晓军. 钢铁冶金尘泥返烧结利用的理论分析与试验研究[J]. 江西冶金,2021,41(1):6.(WEI Heng, FAN Yue-wen,HU Xiao-jun. A theoretical analysis and experimental study on the re-sintering utilization of metallurgical dust[J]. Jiangxi Metallurgy,2021,41(1):6.) [15] 刘超,张玉柱,王峰,等. 多源冶金粉尘资源化研究现状及展望[J]. 中国冶金,2022,32(10):38.(LIU Chao,ZHANG Yu-zhu,WANG Feng,et al. Research status and prospect of multi-source metallurgical dust recycling[J]. China Metallurgy,2022,32(10):38.) [16] WANG Ding-zheng,ZHU De-qing,JIAN Pan,et al. An investigation into the alkali metals removal from zn-bearing dust pellets in direct reduction[J]. JOM,2022,74(2):634. [17] ZHU De-qing,WANG Ding-zheng,PAN Jian,et al. A study on the zinc removal kinetics and mechanism of zinc-bearing dust pellets in direct reduction[J]. Powder Technology,2021,380(5): 273. [18] GUO Yu-hua,QIE Jun-mao,ZHANG Chun-xia,et al. Material flow analysis of zinc during the manufacturing process in integrated steel mills in China[J]. Journal of Industrial Ecology,2021,25(4):1009. [19] 刘纲,干勇,李士琦,等. 高炉含锌粉尘还原性影响因素分析[J]. 中国冶金,2019,29(10):20.(LIU Gang,GAN Yong,LI Shi-qi,et al. Analysis of reducing factors of zinc-bearing blast furnace dust[J]. China Metallurgy,2019,29(10):20.) [20] LI Yan,FENG Huai-xuan,WANG Jing-song,et al. Current status of the technology for utilizing difficult-to-treat dust and sludge produced from the steel industry[J]. Journal of Cleaner Production,2022,367(9):132909. [21] 徐健祥,齐凤升,李宝宽,等. 厚料层转底炉含铁尘泥直接还原模拟[J]. 中国冶金,2021,31(10):94.(XU Jian-xiang,QI Feng-sheng,LI Bao-kuan,et al. Direct reduction simulation of iron-bearing dust in thick-layer rotary hearth furnace[J]. China Metallurgy,2021,31(10):94.) [22] 李博,毛艳丽,王博蔚,等. 转底炉技术及其在含铁尘泥处理中的应用[J]. 鞍钢技术,2017(6):8.(LI Bo,MAO Yan-li,WANG Bo-wei,et al. Treatment process by rotary hearth furnace and its application in treatment of iron-bearing sludge[J]. Angang Technology,2017(6):8.) [23] MAO Rui,WANG Fei,XU Yuan,et al. Preparation process of cold bonded pellets with iron-bearing dust and sludge from steel production process[J]. Metallurgical Research and Technology,2021,118(6):1. [24] SHE Xue-feng,WANG Jing-song,WANG Guang,et al. Removal mechanism of Zn,Pb and alkalis from metallurgical dusts in direct reduction process[J]. Journal of Iron and Steel Research International,2014,21(5):488. [25] YANG Xue,HAO Xian-sheng,LIU Xiao-ming,et al. Recovery of zinc and iron from steel mill dust—An overview of available technologies[J]. Materials,2022,15(12):4127. [26] 武宇亮,姜泽毅,张欣欣,等. 转底炉还原炼钢含锌粉尘球团的数值模拟[J]. 过程工程学报,2012,12(5):803.(WU Yu-liang,JIANG Ze-yi,ZHANG Xin-xin,et al. Numerical simulation on reduction of zinc-containing steel-making dust pellets in a rotary hearth furnace[J]. The Chinese Journal of Process Engineering,2012,12(5):803.) [27] 张建良,李洋,袁骧,等. 中国钢铁企业尘泥处理现状及展望[J]. 钢铁,2018,53(6):1.(ZHANG Jian-liang,LI Yang,YUAN Xiang,et al. Present situation and prospect of dust treatment in Chinese iron and steel enterprises[J]. Iron and Steel,2018,53(6):1.) [28] LIE Pei-jun,LIU Zheng-gen,CHU Man-sheng,et al. Green and efficient utilization of stainless steel dust by direct reduction and self-pulverization[J]. Journal of Hazardous Materials,2021,413(7):125403. [29] 彭程,范建峰. 宝钢转底炉工艺技术发展[J]. 钢铁,2019,54(2):97.(PENG Cheng,FAN Jian-feng. Rotary hearth furnace process development in Baosteel[J]. Iron and Steel,2019,54(2):97.) [30] 毛瑞,王飞,金海,等. 转底炉工艺处理含铁尘泥关键技术[J]. 钢铁,2020,55(8):199.(MAO Rui,WANG Fei,JING Hai,et al. Key technology of treating iron-bearing dust and sludge by rotary hearth furnace process[J]. Iron and Steel,2020,55(8):199.) |
[1] |
XU Runsheng1,2,ZHANG Yuchen1,ZHANG Jianliang1,2,ZHANG Siqi3,YU Jiyong2,CAO Minghui2. Status and trends of steel metallurgical solid waste solidification CO2 research[J]. JOURNAL OF IRON AND STEEL RESEARCH , 2023, 35(7): 779-789. |
[2] |
LIU Shanping, MA Lei, SONG Yunfeng, GUO Gang, LEI Jie, LONG Hongming. Optimization of pretreatment process of pelletizing raw materials in belt roasters[J]. Iron and Steel, 2023, 58(6): 36-44. |
[3] |
WEI Rufei, ZHANG Feihu, MENG Dongxiang, LONG Hongming, LI Jiaxin. Law of zinc-bearing dust from iron and steel plant reduced by biological sludge[J]. Iron and Steel, 2023, 58(6): 134-142. |
[4] |
ZHANG Qi1,2,3,XIANG Ting1,TIAN Shuoshuo1. Construction and development trend of steelchemical cogeneration system in future[J]. JOURNAL OF IRON AND STEEL RESEARCH , 2023, 35(4): 375-384. |
[5] |
MENG Huadong,YANG Yong,YAO Tonglu,HE Qing,LIN Tengchang,LI Longfei. Experiment on dephosphorization process of “remaining slagdouble slag” in combined blown converter[J]. JOURNAL OF IRON AND STEEL RESEARCH , 2022, 34(7): 622-628. |
[6] |
FU Qiang, HE Ying-li, LIU Zhen-hai. Research and practice of shortening process time of 120 t top and bottom compound blowing converter[J]. CONTINUOUS CASTING, 2022, 41(3): 83-88. |
|
|
|
|