Optimization and Scheduling of Byproduct Gas System in Steel Plant
Jing-hui YANG,Jiu-ju CAI,Wen-qiang SUN,Jing-yu LIU
State Environmental Protection Key Laboratory of Eco-industry, Institute of Thermal and Environmental Engineering, Northeastern University, Shenyang 110819, Liaoning, China
Optimization and Scheduling of Byproduct Gas System in Steel Plant
Jing-hui YANG,Jiu-ju CAI,Wen-qiang SUN,Jing-yu LIU
State Environmental Protection Key Laboratory of Eco-industry, Institute of Thermal and Environmental Engineering, Northeastern University, Shenyang 110819, Liaoning, China
ժҪ A mathematical model was proposed to optimize byproduct gas system and reduce the total cost. The scope and boundaries of the system were also discussed at the same time. Boilers and gasholders were buffer users to solve the fluctuation of byproduct gases. The priority of gasholders should be ranked the last. The allocation of surplus gases among gasholders and boilers was also discussed to make full use of gases and realize zero emission targets. Case study shows that the proposed model made good use of byproduct gases and at least 7.8% operation cost was reduced, compared with real data in iron and steel industry.
Abstract��A mathematical model was proposed to optimize byproduct gas system and reduce the total cost. The scope and boundaries of the system were also discussed at the same time. Boilers and gasholders were buffer users to solve the fluctuation of byproduct gases. The priority of gasholders should be ranked the last. The allocation of surplus gases among gasholders and boilers was also discussed to make full use of gases and realize zero emission targets. Case study shows that the proposed model made good use of byproduct gases and at least 7.8% operation cost was reduced, compared with real data in iron and steel industry.
��������:Item Sponsored by Science and Technology Research Funds of Liaoning Provincial Education Department of China
ͨѶ����:
���
E-mail: yjh_820707@126.com
����:
Jing-hui YANG,Jiu-ju CAI,Wen-qiang SUN,Jing-yu LIU. Optimization and Scheduling of Byproduct Gas System in Steel Plant[J]. �й������ڿ���, 2015, 22(5): 408-413.
Jing-hui YANG,Jiu-ju CAI,Wen-qiang SUN,Jing-yu LIU. Optimization and Scheduling of Byproduct Gas System in Steel Plant. Chinese Journal of Iron and Steel, 2015, 22(5): 408-413.