|
|
Effect of Pig Iron Charge on Converter Steelmaking |
YANG Wenyuan1,ZOU Jiezhong2,WANG Minglin1,XIAO Shixin2 |
1. Metallurgical Department, Central Iron and Steel Research Institute, Beijing 100081, China; 2. Technical Center, Pingxiang Iron and Steel Group Co., Pingxiang 337000, Jiangxi, China |
|
|
Abstract Excessive pig iron is usually charged in converter in order to increase steel output at middle and small steel plants.But some problems are occurred,such as low bath temperature, difficulty in lime melting,slag overflow at vessel mouth, increase of metal consumption, difficulty in dephosphorization and low hitting rate at the final. In order to keep the normal bath temperature and slag forming condition, the charge of pig iron should not be exceeded 10% on middle and small converter.
|
Received: 01 January 1900
|
|
|
|
[1] |
LI Lin, LI Ming-ming, LI Qiang, ZOU Zong-shu. Melt splashing behavior of steelmaking converter with nozzle-twisted lance[J]. Iron and Steel, 2020, 55(6): 54-60. |
[2] |
ZHANG Jian-liang, SUN Min-min, LI Ke-jiang, LI Hong-tao. Present situation and prospect of dissolution behavior of metallurgical coke in blast furnace hot metal[J]. Iron and Steel, 2020, 55(4): 1-11. |
[3] |
YANG Li-bin, ZENG Jia-qing, DENG Yong, XU Xiao-wei, WU Li-ping. Highly efficiency and long-life combined blowing technology of big converter[J]. Iron and Steel, 2020, 55(4): 45-52. |
[4] |
DONG Wen-liang, PAN Hong-wei, LUO Lei, JI Chen-xi, LI Hai-bo, TIAN Zhi-hong. Phosphorous distribution in dephosphorization slag[J]. Iron and Steel, 2020, 55(2): 75-81. |
[5] |
ZHANG Jian. Quantitative analysis of hot metal composition and TiO2 load #br# for effective furnace maintenance in Shougang Jingtang[J]. Iron and Steel, 2019, 54(9): 39-43. |
[6] |
ZHOU Zhenyu, TANG Ping, ZHOU Zunchuan, HOU Zibing, WEN Guanghua. Optimization on nozzle parameters of 200 t combined blowing vanadium extraction converter[J]. Iron and Steel, 2019, 54(9): 50-56. |
|
|
|
|