钢铁
 
             Home | About Journal | Editorial Board | Instruction for Authors | Subscriptions | Advertisement | Contacts Us | Chinese
Iron and Steel  2011, Vol. 46 Issue (9): 11-16    DOI:
Raw Materials and Ironmaking Current Issue| Next Issue| Archive| Adv Search |
Optimizing Ore Blending Technology for 550m2 Sintering Machine
ZHAO Zhi-xing1,AN Gang2,PEI Yuan-Dong1,ZHAO Yong1,PAN Wen1
(1. Shougang Research Institute of Technology, Beijing 100043, China
2. The Sintering Plant of Shougang Jingtang, Tangshan 063200, Hebei, China)

Copyright © IRON AND STEEL 
Supported by: Beijing Magtech