Abstract:The production process of extra-thickness slab caster was studied. The key factors affecting the casting speed, matching relation of the caster and converter, the effect of dead solidification time on the shrinkage and some related problems were discussed in details. Finally, some effective routes to improve the process quality were proposed.
马春武. 对特厚板坯连铸机工艺问题的探讨[J]. 中国钢铁期刊网, 2011, 30(4): 1-7.
MA Chun-wu. Analysis of Process Problems for Extra-Thickness Slab Caster. Chinese Journal of Iron and Steel, 2011, 30(4): 1-7.