(1. Publishing Center, North China University of Science and Technology, Tangshan 063210, Hebei, China 2. HBIS Tangshan Heavy Plate Co., Ltd., Steelwork Department, Tangshan 063610, Hebei, China)
Abstract:The internal structure of slab tundish was optimized by water modeling experiment based on the practical production. The results showed that the scheme containing turbulence suppression device, single baffle and double dams was the best solutions. In this condition, the dead zone volume proportion was 0.14%, the active zone volume proportion was 0.23%, which was favorable for the removal of inclusions and increase of yield of molten steel. The submerged nozzle was optimized to use four slag lines during a casting cycle by radium automatic control liquid level function and automatic lifting function of tundish car. Through this operation, submerged nozzle change times was decreased by one, and the purity of molten steel during casting process was improved effectively.
收稿日期: 2018-04-16
出版日期: 2019-01-29
引用本文:
许建飞,刘志远,王重君,程巨广,田宝义,张 杰. 板坯连铸过程夹杂物控制研究[J]. , 2018, 37(6): 61-66.
XU Jian-fei,,LIU Zhi-yuan,WANG Chong-jun,CHENG Ju-guang, TIAN Bao-yi,ZHANG Jie. Study on inclusion control during the slab continuous casting process.. , 2018, 37(6): 61-66.