连铸
 
             Home | About Journal | Editorial Board | Instruction for Authors | Subscriptions | Advertisement | Contacts Us | Chinese
CONTINUOUS CASTING  2023, Vol. 42 Issue (1): 112-117    DOI: 10.13228/j.boyuan.issn1005-4006.20220170
Technology Exchange Current Issue| Next Issue| Archive| Adv Search |
Automation transformation and optimization of the assembly and disassembly system of the ladle slide plate oil cylinder
LIU Chang-wei1, LIU Yong-jun1, YUAN Chun-an1, CHEN Chao2, FU Jun2
1. Continuous Casting Operation Area of Steelmaking Plant,Ningbo Iron and Steel Co., Ltd., Ningbo 315807,Zhejiang, China;
2. Robot Division,Ramon Science and Technology Co., Ltd., Changsha 410000,Hunan,China

Copyright © CONTINUOUS CASTING 
Supported by: Beijing Magtech