Water model experimental of dephosphorization pretreatment in converter
YANG Wen-yuan1,LI Lin2,PENG Xiao-yan2,WANG Ming-lin2,GAO Fei2,WU Hong-zuo3
(1. Metallurgical Technology Institute, Central Iron and Steel Research Institute, Beijing 100081, China 2. New Metallurgy Hi-Tech Group Co., Ltd., China Iron and Steel Research Institute Group, Beijing 100081, China 3. Energy-Saving Technology Service Center in Chongqing, Chongqing 404100, China
Abstract:Mixing time in bath, top blowing jet penetrating depth and emulsification rate between slag and molten steel were measured under different blowing conditions in 1/9 plexiglass model. Scrap movement status in dephosphorization pretreatment bath was studied. Suspension energy of different weight scrap in the bath was measured. To better understand the characteristics of dephosphorization pretreatment process, all the values were compared with normal steelmaking converter correspondingly. A and B two kinds of dephosphorization pretreatment conditions were compared according to the measurement results of water model. From the overall situation, the operation of A convert is more reasonable, phosphorus content after pretreatment in hot metal can be reduced to 0.010%-0.015%, be equivalent to the level of Japan’s Wakayama Steel Plant.
收稿日期: 2014-10-14
出版日期: 2015-09-08
引用本文:
杨文远,李 林,彭小艳,王明林,高 飞,吴鸿祚. 转炉铁水脱磷预处理水模试验[J]. 钢铁, 2015, 50(9): 34-40.
YANG Wen-yuan,LI Lin,PENG Xiao-yan,WANG Ming-lin,GAO Fei,WU Hong-zuo. Water model experimental of dephosphorization pretreatment in converter. Iron and Steel, 2015, 50(9): 34-40.