Abstract:High-speed continuous casting was the premise to make direct rolling or continuous casting and rolling come true, the embody for realizing high-efficiency and green steelmaking production line, and the theme for developing new generation of high-efficiency continuous casting technology. Presently, the most challenge for high-speed continuous casting was the occurrence of breakout and cracks with high frequency. Therefore, to make it come true, the core was the control of homogenous growth of solidifying shell during casting, the most importance was the technology integration of continuous casting mold including flow control, flux type, lubrication, inner shape and cooling system, the key was the steady control of liquid steel level in mold. The transport phenomena in mold with high-speed casting and the related key technologies were presented and discussed.
朱苗勇. 高拉速连铸过程传输行为特征及关键技术探析[J]. 钢铁, 2021, 56(7): 1-12.
ZHU Miao-yong. A study of transport phenomena and key technologies for high-speed continuous casting of steel[J]. Iron and Steel, 2021, 56(7): 1-12.
[1] 干勇.现代连续铸钢实用手册[M].北京:冶金工业出版社,2010.(GAN Yong. User Manual for Modern Continuous Casting of Steel[M]. Beijing: Metallurgical Industry Press,2010.) [2] 邓小旋, 潘宏伟, 季晨曦, 等. 常规低碳钢板坯的高速连铸工艺技术[J]. 钢铁, 2019, 54(8): 70. (DENG Xiao-xuan, PAN Hong-wei, JI Chen-xi, et al. Review on high speed conventional slab continuous casting of low carbon steels [J]. Iron and Steel, 2019, 54(8): 70.) [3] Suzuki M, Suzuki M, Nakada M. Perspectives of research on high-speed conventional slab continuous casting of carbon steels [J]. ISIJ International, 2001, 41(7): 670. [4] Lee S M, Hwang J Y, Lee S H, et al. Revamping of the no. 2-3 slab caster at Posco Gwangyang: Design, start-up and initial operation results [J]. La Metallurgia Italiana, 2009(1): 33. [5] Min B J, Shin G, Lee S H. Development of the high-speed, thin-slab casting technology of POSCO[J]. Iron and Steel Technology, 2013, 10(7): 76. [6] LI Lin-ping, WANG Xin-hua, DENG Xiao-xuan, et al. Application of high speed continuous casting on low carbon conventional slab in SGJT[J]. Steel Research International, 2014, 85(11):1490. [7] Kanazawa T, Hiraki S, Kawamoto M, et al. Behavior of lubrication and heat transfer in mold at high speed continuous casting [J]. Tetsu-to-Hagane, 1997, 83(11): 701. [8] Zuzuki M, Mizukami H, Kitagawa T, et al. Development of new mold oscillation mode for high-speed continuous casting of steel slabs [J]. ISIJ International, 1991, 31(3): 254. [9] Yu K O. Modeling for Casting and Solidification Process [M]. NewYork: Marcel Dekker Inc, 2001. [10] 雷洪. 连铸结晶器内异相迁移行为的数学物理模拟[D]. 沈阳: 东北大学, 2000. (LEI Hong. Numerical Simulation and Physical Modelling of Transport Phenomena of Different Phases in the Continuous Casting Mould [D]. Shenyang: Northeastern University, 2000.) [11] 曹娜, 朱苗勇. 高拉速板坯连铸结晶器内钢/渣界面行为的数值模拟[J]. 金属学报, 2007, 43(8): 834. (CAO Na, ZHU Miao-yong. Numerical simulation for the interfacial behavior of steel and slag in a slab continuous casting mold with high casting speed[J]. Acta Metallurgica Sinica, 2007, 43(8): 834.) [12] 于海岐, 朱苗勇. 板坯连铸结晶器电磁制动和吹氩过程的多相流动现象[J]. 金属学报, 2008, 44(5):619. (YU Hai-qi, ZHU Miao-yong. Multiphase flow phenomena in a slab continuous casting mold with electromagnetic brake and argon gas injection[J]. Acta Metallurgica Sinica, 2008, 44(5):619.) [13] Teshima T, Kubota J, Suzuki M, et al. Influence of casting conditions on molten steel flow in continuous casting mold at high speed casting of slabs [J]. Tetsu-to-Hagane, 1993, 79(5): 576. [14] 于海岐, 朱苗勇. 板坯结晶器电磁制动和吹氩过程的钢/渣界面行为[J]. 金属学报, 2008, 44(9):1141. (YU Hai-qi, ZHU Miao-yong. The interfacial behavior of molten steel and liquid slag in slab continuous casting mold with electromagnetic brake and argon gas injection[J]. Acta Metallurgica Sinica, 2008, 44(9): 1141.) [15] Ito Y, Nabeshima S, Miki Y, et al. Evaluation of solidified shell thickness by thermocouple in mold[J]. ISIJ International, 2019, 59(12): 2239. [16] QIAN Hai-tao, HE Fei, XIE Xi-an, et al. Recovery mechanism of the sticking-type breakout during continuous casting of steel[J]. Ironmaking and Steelmaking, 2019, 46(3):259. [17] 蔡兆镇, 朱苗勇. 板坯连铸结晶器内钢凝固过程热行为研究I. 数学模型[J]. 金属学报, 2011, 47(6):671. (CAI Zhao-zhen, ZHU Miao-yong. Simulation of thermal behavior during steel solidification in slab continuous casting mold I. Mathematical model [J]. Acta Metallurgica Sinica, 2011, 47(6): 671.) [18] CAI Zhao-zhen, ZHU Miao-yong. Thermo-mechanical behavior of peritectic steel solidifying in slab continuous casting mold and a new mold taper design[J]. ISIJ International, 2013, 53(10): 1818. [19] Poirier D R, Geiger G H. Transport Phenomena in Materials Processing [M]. Switzerland: Springer, 2016. [20] Ogibayashi S, Tatsuo M, Yoshihito M, et al. Mold powder technology for continuous casting of low-carbon aluminum-killed steel [J]. Nippon Steel Technical Report, 1987, (34): 1. [21] Wolf M M. Mold heat transfer and lubrication control—Two major functions of caster productivity and quality assurance [C]//13th Process Technology Conference Proceedings. Nashville: Iron and Steel Society, 1995: 99. [22] Kikuchi H, Hanao M, Kawamoto M, et al. Continuous casting technologies of 8 m/min casting speed by Sumitomo′s QSP process[C]//83rd Steelmaking Conference Proceedings.Pittsburgh: Iron and Steel Society, 2000:23. [23] Kwon O D, Choi J, Lee I R, et al. Optimization of mold oscillation pattern for the improvement of surface quality and lubrication in slab continuous casting[C]//74th Steelmaking Conference Proceedings.Pittsburgh:Iron and Steel Society, 1991:561. [24] Tsutsumi K, Nagasaka T, Hino M. Surface roughness of solidified mold flux in continuous casting process [J]. ISIJ International, 1999, 39(11): 1150. [25] Gantner A, Chimani C M, Watzinger J. Medium slab casting of peritectic steels at nova hut at high casting speed [J]. BHM, 1999, 144(7): 276. [26] 苏志坚,江中块,陈进, 等. 板坯连铸过程结晶器内钢液面异常波动的机理[C]//第十二届中国钢铁年会论文集. 北京:中国金属学会,2019: 1. (SU Zhi-jian, JIANG Zhong-kuai, CHEN Jin, et al. Study on mechanism of large amplitude mold level fluctuation in slab continuous casting processs [C]//Proceedings of the 12th CSM Steel Congress. Beijing: The Chinese Society for Metals, 2019: 1) [27] 熊爽,陶晓林,章昱,等. 包晶钢连铸结晶器钢水液面波动影响因素分析[J]. 连铸,2014(6): 16. (XIONG Shuang, TAO Xiao-lin, ZHANG Yu, et al. Influencing factors analysis on the mold level fluctuation of continuous casting peritectic steel [J]. Continuous Casting, 2014(6): 16.) [28] Yoon U S, Bang In W, Rhee J H, et al. Analysis of mold level hunching by unsteady bulging during thin slab casting [J]. ISIJ International, 2002, 42(10): 1103. [29] 杨拉道,黄进春,李淑贤. 直弧形板坯连铸设备[M]. 北京:冶金工业出版社, 2017. (YANG La-dao,HUANG Jin-chun, LI Shu-xian. Equipment of Slab Continuous Casting Machine with Vertical-Curve Type [M]. Beijing: Metallurgical Industry Press, 2017.) [30] 朱苗勇. 新一代高效连铸技术发展思考[J]. 钢铁,2019,54(8):21. (ZHU Miao-yong. Some considerations for new generation of high-efficiency continuous casting technology development [J]. Iron and Steel, 2019, 54(8): 21.) [31] 田立,田运辉,谢卫东, 等. 基于前馈补偿方式的板坯结晶器液面周期性波动研究[J]. 炼钢,2019,35(4): 38. (TIAN Li,TIAN Yun-hui, XIE Wei-dong, et al. Research on periodic fluctuation of liquid steel level in the slab mold based on feedforward compensation method [J]. Steelmaking, 2019, 35(4): 38.)