Discussion on Full Ladle Preparation for Sequential Casting |
WANG Feng,TIAN Naiyuan,HE Dongfeng,XU Anjun |
Metallurgical and Ecological Engineering School, University of Science and Technology Beijing, Beijing 100083, China |
|
|
Abstract The preparation of spare full ladles at some steel works was analyzed for five reasons and the formula calculating the time of every procedure without spare full ladles are proposed.Six measures which could decrease the number of spare full ladles before start of casting are put forward. Finally, the formulas of rational number of spare full ladles and maximal heat number of sequential casting are given.
|
Received: 01 January 1900
|
|
|
|
[1] |
De-Xin YE. Development and Application of tundish quick change process for Billet Continuous Casting[J]. , 2019, 44(6): 0-0. |
[2] |
. Analysis and Measures of Nozzle Clogging in Big Round Billet Continuous Casting Machine[J]. , 2019, 44(6): 0-0. |
[3] |
WU Guo-qing,WEN Guo-yuan,CHEN Wei-qiang,LIU Yong-long. The design features and application of special large section round bloom caster[J]. , 2018, 43(6): 77-80. |
[4] |
SUN Bo,WANG Zhen-ming,DUAN Xue-liang,WANG Guo-lian,JIANG Hai-tao5. The principle difference and comparative analysis of alignment measure in continuous caster[J]. , 2018, 43(5): 63-66. |
[5] |
WU You,AN Ling-jun,SHAN Jin-tao. Recover precision of continuous casting machine by using analytic method[J]. , 2018, 43(5): 70-74. |
[6] |
YU Xue-cheng,LIU Feng-gang,MA Wei,NI You-jinZHU Jian-qiang,LIU Guo-liang. Development and application of chamfer mould in Shougang Qian’an Steel[J]. , 2018, 43(5): 75-79. |
|
|
|
|