Integrated production planning of steelmaking-continuous casting-hot rolling considering coordination between casting and rolling

ZHENG Zhong, WANG Yong-zhou, LU Yi, GAO Xiao-qiang

Iron and Steel ›› 2020, Vol. 55 ›› Issue (12) : 107-113.

PDF(1159 KB)
Welcome to visit Iron and Steel, July 26, 2025
PDF(1159 KB)
Iron and Steel ›› 2020, Vol. 55 ›› Issue (12) : 107-113. DOI: 10.13228/j.boyuan.issn0449-749x.20200124
Equipment Technology

Integrated production planning of steelmaking-continuous casting-hot rolling considering coordination between casting and rolling

Author information +
History +

Abstract

Integrated production planning of steelmaking-continuous casting-hot rolling is a complex combinatorial optimization problem with multi-objectives and multi-constraints. From the perspective of facilitating a multi-process production organization,an integrated production planning strategy that is planned separately by sub-process and coordinated by casting and rolling is proposed. From the strategy,charge plan,casting plan,and hot rolling plan are respectively made according to the production targets and constraints of steel-making,continuous casting and hot rolling with the slab as the basic unit. Then,the casting and rolling coordination optimization is carried out to obtain an integrated production plan from the casting and rolling connection relationship. In the coordination of casting and rolling,the goal of reducing the time difference between casting and rolling,which would increase the hot charging ratio,is used to optimize and coordinate the interface between continuous casting and hot rolling. According to the production order data,production plan objectives,and constraints of a steel plant,the effectiveness of the integrated production planning method is verified by comparing model simulation calculation and production performancedata.

Key words

steelmaking-continuous casting-hot rolling / production planning / integrated method / coordination model / time difference between casting and rolling

Cite this article

Download Citations
ZHENG Zhong, WANG Yong-zhou, LU Yi, et al. Integrated production planning of steelmaking-continuous casting-hot rolling considering coordination between casting and rolling[J]. Iron and Steel, 2020, 55(12): 107-113 https://doi.org/10.13228/j.boyuan.issn0449-749x.20200124

References

[1] 颉建新, 张福明. 钢铁制造流程智能制造与智能设计[J]. 中国冶金, 2019,29(2): 1.(JIE Jian-xin, ZHANG Fu-ming. Intelligent manufacturing and intelligent design of iron and steel manufacturing process[J]. China Metallurgy, 2019, 29(2): 1.)
[2] 赵振锐, 孙雪娇. 钢铁企业智能制造架构的探索、实践及展望[J]. 冶金自动化, 2019,43(1): 24.(ZHAO Zhen-rui, SUN Xue-jiao. Exploration,practice and prospect of intelligent manufacturing structure of iron and steel enterprises[J]. Metallurgical Industry Automation, 2019,43(1): 24.)
[3] 王国栋. 高质量中厚板生产关键共性技术研发现状和前景[J]. 轧钢, 2019,36(1): 1.(WANG Guo-dong. Status and prospects of research and development of key common technologies for high-quality heavy and medium plate production[J]. Steel Rolling, 2019, 36(1): 1.)
[4] 刘文仲. 中国钢铁工业智能制造现状及思考[J]. 中国冶金, 2020,30(6): 1.(LIU Wen-zhong. Current situation and thinking of intelligent manufacturing in China's iron and steel industry[J]. China Metallurgy, 2020,30(6): 1.)
[5] 唐立新, 杨自厚, 沈宏宇, 等. 炼钢-连铸-热轧集成批量计划因素分析[J]. 钢铁, 2000,35(5): 74. (TANG Li-xin, YANG Zi-hou, SHEN Hong-yu, et al. Analysis of modeling factor of integrated lot planning for SM-CC-HRM[J]. Iron and Steel, 2000,35(5):74.)
[6] 孙福权, 郑秉霖, 崔建江, 等. 炼钢-热轧一体化管理的生产计划编制问题研究[J]. 自动化学报, 2000,26(3): 409. (SUN Fu-quan, ZHENG Bing-lin, CUI Jian-jiang, et al. The reaearch of production planning of integrated management in steelmaking-hot rolling[J]. Acta Automatica Sinica, 2000,26(3):409.)
[7] 刘怡, 郑忠, 陈开, 等. 炼钢连铸热轧一体化批量计划编制模型及实现[J]. 重庆大学学报, 2012,35(3): 60. (LIU Yi, ZHENG Zhong, CHEN Kai, et al. Modeling and realizing of integrated batch planning for steelmaking-continuous casting and hot strip rolling[J]. Journal of Chongqing University, 2012,35(3):60.)
[8] LIN Jian-hua, LIU Min, HAO Jing-hua, et al. A multi-objective optimization approach for integrated production planning under interval uncertainties in the steel industry[J]. Computers and Operations Research, 2016,72: 189.
[9] 张春生, 李铁克. 炼钢与热轧批量计划协调优化模型与算法[J]. 信息与控制, 2017,46(1): 122. (ZHANG Chun-sheng, LI Tie-ke. Optimization model and algorithm for lot planning coordination between steelmaking and hot rolling[J]. Information and control, 2017,46(1):122.)
[10] ZHU Bao-lin, JI Shou-feng. Steelmaking-hot rolling scheduling model and method for integrated management in iron and steel enterprises[J]. Advanced Materials Research, 2013,860-863: 3094.
[11] 刘立钧, 温治, 苏福永, 等. 冶铸轧混装一体化调度管理系统研究及应用[J]. 冶金自动化, 2014,38(1): 28.(LIU Li-jun, WEN Zhi, SU Fu-yong, et al. Research and application of hybrid integrated scheduling management system of steelmaking-casting-rolling[J]. Metallurgical Industry Automation, 2014,38(1): 28.)
[12] 孙玲, 李铁克. 炼钢-连铸-热轧批量计划的约束满足算法[J]. 计算机集成制造系统, 2007,13(5): 940. (SUN Ling, LI Tie-ke. Constraint satisfaction algorithm of batch planning for steel making-continuous casting-hot rolling[J]. Computer Integrated Manufacturing Systems, 2007,13(5):940.)
[13] 张文学, 李铁克. 基于动态约束满足的连铸热轧一体化滚动计划[J]. 计算机集成制造系统, 2011,17(10): 2177. (ZHANG Wen-xue, LI Tie-ke. Integration of continuous-casting and hot-rolling rolling plan based on dynamic constraint satisfaction[J]. Computer Integrated Manufacturing Systems, 2011, 17(10):2177.)
[14] 张文学, 李铁克. 面向多种生产工艺的冶铸轧一体化批量计划优化[J]. 计算机集成制造系统, 2013,19(6): 1296. (ZHANG Wen-xue, LI Tie-ke. Batch plan optimization of steel integrated production with multiple processes[J]. Computer Integrated Manufacturing Systems, 2013,19(6):1296.)
[15] 李耀华, 胡国奋, 王伟, 等. 炼钢-连铸-热轧一体化生产计划编制方法研究[J]. 控制工程, 2005,6: 549. (LI Yao-hua, HU Guo-fen, WANG Wei, et al. Rereasch on the method of integrated production planning for steelmaking-continuous casting-hot rolling[J]. Control Engineering of China, 2005,6:549.)
[16] GUO Dong-feng, LI Fu-liang, LI Tie-ke. Integrated batch planning model and algorithm for steelmaking-continuous casting-hot rolling:2009[C]//The 4th IEEE Conference on Industrial Electronics and Applications (ICIEA 2009). Xi'an: IEEE, 2009.
[17] 郑忠, 刘怡, 陈开, 等. 炼钢-连铸-热轧生产计划编制的统一模型及智能算法[J]. 北京科技大学学报, 2013,35(5): 687. (ZHENG Zhong, LIU Yi, CHEN Kai, et al. Unified modeling and intelligent algorithm of production planning for the process of steelmaking, continuous casting and hot rolling[J]. Journal of University of Science and Technology Beijing, 2013,35(5):687.)
[18] TANG Li-xin, WANG Gong-shu. Decision support system for the batching problems of steelmaking and continuous-casting production[J]. Omega, 2008,36(6): 976.
[19] 卢义. 连铸热轧协调的一体化生产计划智能优化方法研究[D]. 重庆: 重庆大学, 2019.(LU Yi. Research on Intelligent Optimization Method of Integrated Production Planning for Coordination of Continuous Casting and Hot Rolling[D]. Chongqing: Chongqing University, 2019.)
PDF(1159 KB)

23

Accesses

0

Citation

Detail

Sections
Recommended

/