面向回采装备多目标调度的改进遗传退火算法

Improved Genetic Simulated Annealing Algorithm for Multi-objective Scheduling of Extraction Equipment

  • 摘要: 针对地下金属矿山传统单目标调度模型适应性不足的问题,以总完工时间与总工序间隔时间最小化为优化目标,结合矿石开采、运输、提升等环节中装备运行状态与资源需求的实际工况特征,构建了回采装备多目标调度优化模型。为将多目标调度问题合理转化为可求解的单目标决策模型,设计了一种基于层次分析法-熵权法(Analytic Hierarchy Process-Entropy Weight Method,AHP-EWM)的多目标综合赋权方法,通过静态赋权与动态权重调整相结合的策略,实现多目标参数的精确权重配置。以赋权后的单目标综合优化模型为求解对象,针对传统遗传算法收敛速度慢、易陷于局部最优的固有缺陷,引入自适应算子与模拟退火机制,提出了改进遗传退火算法(Improved Genetic Simulated Annealing Algorithm,IGASA)。实例验证结果表明:相较于传统调度方法,所提方法在总完工时间上降低36.54%,总工序间隔时间减少38.13%,调度性能提升显著。进一步地,为将所求解的调度方案直观应用于生产管理,提出了生产调度数字孪生系统的流程架构,支持调度计划的动态仿真与实时监控,从而形成“权重配置—模型求解—可视化呈现”的完整技术链条,为地下矿山智能化调度系统的构建提供了理论依据与技术支撑。

     

    Abstract: To address the insufficient adaptability of traditional single-objective scheduling models for underground metal mines,a multi-objective scheduling optimization model for stoping equipment was constructed. The model takes the minimization of the makespan and total inter-operation interval time as the optimization objectives and incorporates the actual workingcondition characteristics of equipment operating states and resource requirements in ore mining,haulage,and hoisting. To reasonably transform the multi-objective scheduling problem into a solvable single-objective decision model,a multi-objective comprehensive weighting method based on the Analytic Hierarchy Process-Entropy Weight Method(AHP-EWM) was designed. By combining static weighting with dynamic weight adjustment,this method achieves precise weight configuration of multi-objective parameters. Taking the weighted single-objective comprehensive optimization model as the object to be solved,and considering the inherent shortcomings of traditional genetic algorithms,such as slow convergence and susceptibility to local optima,adaptive operators and a simulated annealing mechanism were introduced,and an Improved Genetic Simulated Annealing Algorithm(IGASA) was proposed. Case study results show that,compared with conventional scheduling methods,the proposed method reduces the makespan by 36. 54% and the total inter-operation interval time by 38. 13%,indicating significantly improved scheduling performance. Furthermore,to intuitively apply the obtained scheduling scheme to production management,a process architecture for a production scheduling digital twin system was proposed,which supports dynamic simulation and real-time monitoring of scheduling plans,thereby forming a complete technical chain of " weight configuration-model solving-visualization presentation" and providing a theoretical basis and technical support for constructing intelligent scheduling systems for underground mines.

     

/

返回文章
返回