  • 摘要: 层状充填体内新掘巷道的稳定性控制是确保矿井安全生产的关键环节。以贵州省某磷矿山为工程背景,通过引入煤矿顶板评级法(Coal Mine Roof Rating,CMRR),采用现场调研、室内试验和理论分析的综合性研究方法,评估层状充填体内新掘巷道顶板的质量等级,探讨CMRR法在磷矿山充填开采中的适用性。结合评级结果和现场实际优化了巷道支护方案,并采用数值模拟手段对比分析了支护优化前后巷道顶板的位移分布、支护结构位移、塑性区分布及耗散能密度分布特征。通过开展现场工业性试验获取了69 d的顶板离层监测数据,验证了数值模拟结果的合理性。研究表明:充填体内新掘巷道内2处测点的CMRR评级分别为中等顶板和弱顶板;优化后的支护方案显著提升了巷道稳定性,顶板最大沉降值和水平位移量均降低了80%,锚杆沉降值降低了79.6%,塑性区范围减小了52.2%,耗散能密度降低了91.5%。研究成果验证了CMRR法在层状充填体质量评价中的适用性,可为革新层状充填体内新掘巷道的稳定性控制技术提供理论和实践参考。

     

    Abstract: Stability control of newly excavated roadways in layered backfill is critical to ensuring safe underground mining operations. Taking a phosphate mine in Guizhou Province,as the engineering background,this study introduced the Coal Mine Roof Rating(CMRR) method and employed a comprehensive research approach combining field investigation,laboratory testing,and theoretical analysis to evaluate the roof quality grades of newly excavated roadways within layered backfill,and to assess the applicability of the CMRR method to backfill mining in phosphate mines. Based on the rating results and onsite conditions,the roadway support scheme was optimized. Numerical simulations were conducted to compare and analyze,before and after support optimization,the displacement distribution of the roadway roof,support structure displacements,plastic zone distribution,and dissipated energy density characteristics. Field industrial trials were carried out,and roof separation monitoring data over 69 days were obtained to validate the numerical simulation results. The findings indicate that the CMRR ratings for the two monitoring points in the newly excavated roadway within the backfill correspond to a moderate roof and a weak roof,respectively. The optimized support scheme significantly improved roadway stability:the maximum roof settlement and horizontal displacement were both reduced by 80%,bolt displacement decreased by 79. 6%,the extent of the plastic zone shrank by 52. 2%,and the dissipated energy density dropped by 91. 5%. These results confirm the applicability of the CMRR method for quality evaluation of layered backfill masses and provide both theoretical and practical references for innovating stability control technologies for newly excavated roadways in such backfill environments.

     

/

返回文章
返回