Abstract:
Wall accretion develops greatly in the bosh,belly,the first and second section of the stack of Anyang Steel No.2BF,leading to severe unsmooth furnace running,and severe abnormal conditions;burden hanging,slipping,and channeling occur frequently.It is believed that these problems are mainly caused by:(1) deteriorated of coke quality;(2) degraded sinter quality;(3) improper operational adjustments and countermeasures.During the trouble shooting process,the wall accretion elimination work starts from the bosh,belly,and lower part of the stack,and then extends to the middle and upper part of the stack.The measures mainly include adjusting the burden distribution matrix,lowering the coke load,blocking the tuyere,and dosing the furnace slugging agents.After about 10 days of efforts,the furnace conditions restore normal.