Abstract:Being demonstrated by production data, the benefits of both economical and social have been achieved by more stable melting process, decrease of BOF reblow rate, less consumption of raw material, longer converter campaign, shorter melting time, better working conditions with computerized automatic steel making process on 120ton BOF at Tonggang. The existing problems and further improvements are summarized.
关春立;王明春;刚占库. 通钢120 t转炉实现计算机自动炼钢的实践[J]. 钢铁, 2007, 42(5): 82-0.
GUAN Chunli;WANG Mingchun;GANG Zhanku. Practice of Computerized Automatic Steel Making Process on 120 t BOF at Tonggang. Iron and Steel, 2007, 42(5): 82-0.